Description

MRP II and Production Management: Planning, Calculating and Controlling Requirements

Understand how requirements planning actually works before blaming the system for its proposals

  • 2 days — 14 h
  • In-person or virtual
  • Foundation
  • Up to 6 participants

The system suggests launching a production order that is already running and buying a component that is sitting in stock. Planners correct entries by hand, switch off the proposals and end up working on a parallel spreadsheet. The problem rarely lies with the software: it lies with the technical data and the parameters that nobody has kept up to date.

Two days to revisit the MRP II mechanics, from planning horizons through to the reconciliation of load and capacity, covering technical data and net requirements calculation along the way. Every step is worked through manually on a complete case study before being applied to each participant's own context.

Learning objectives

  • Position the different planning levels in relation to one another
  • Structure the technical data that feeds the requirements calculation
  • Work through a net requirements calculation across several bill-of-materials levels
  • Interpret the messages and proposals generated by the system
  • Compare calculated load with genuinely available capacity

What makes this programme different

Net requirements calculation is worked through manually before being observed in a system
Lot-sizing parameters are tested to measure their effect on inventory
Each participant leaves with a list of the data to correct in their own system

Programme

1MRP II architecture

From the sales and operations plan to the production order

  • Distinguish the sales and operations plan from the master production schedule
  • Understand the role of net requirements calculation within the whole
  • Identify the rough-cut capacity validation loops at each level
  • Clarify who decides what at each planning horizon

2Technical data

Data quality determines plan quality

  • Structure item master records and multi-level bills of materials
  • Complete routings and work centre data
  • Set lead times and lot-sizing rules
  • Organise data maintenance over time

3Requirements calculation

Following the process step by step

  • Work through a net requirements calculation level by level
  • Apply backward scheduling and measure the remaining float
  • Distinguish firm orders from planned orders
  • Interpret the system's rescheduling messages

4Load, capacity and control

Making the plan genuinely achievable

  • Compare calculated load with available capacity by work centre
  • Level an overloaded plan without degrading customer service
  • Handle disruptions and weekly rescheduling
  • Monitor plan adherence and data accuracy indicators

Who is it for

Production planners, schedulers, supply planners and logistics managers using or implementing a production management system.

Prerequisites

No prerequisites

Dates & locations

36 scheduled dates between November 2026 and December 2027. Seats are confirmed in the order enquiries are received.

November 2026

December 2026

January 2027

February 2027

March 2027

April 2027

May 2027

June 2027

September 2027

October 2027

November 2027

December 2027

None of these dates suit you? We open additional sessions on request, and any programme can be run privately for your team.

Practical details

Before the programme
Online positioning questionnaire. Your development objectives are shared with the trainer, who tailors the practical case studies to your context.
Teaching methods
Theoretical input, workshops and practical case studies. Digital course materials and method sheets provided.
Assessment
Multiple-choice tests and role-play exercises. Assessment of learning at the start and end of the programme, with immediate and 60-day follow-up evaluations.
After the programme
One year of access to the e-learning platform. Self-assessment of the skills acquired and a 30-day follow-up session with your trainer.
How to register
Registration online or on the basis of a quotation.
Lead time
11 working days after confirmation of registration.
Accessibility
Accessible to people of determination. Contact our accessibility coordinator to design a suitable solution: contact@mpf-academy.ae
Start dates
Rolling intake: in addition to the scheduled sessions, this programme can start on request.