Building Energy Retrofit: Auditing, Costing and Managing the Works

Turn an energy audit into a realistic works programme and verify the savings actually delivered

  • 1 day — 7 h
  • In-person or virtual
  • Intermediate
  • Up to 6 participants

The audit sits on the shelf. It sets out scenarios with costs that alarm decision-makers and projected savings based on assumptions nobody has tested. Yet between envelope insulation, plant replacement and ventilation upgrades, the sequence of operations determines both the final outcome and the level of support or incentives that can be secured.

This 7-hour day is designed for professionals who already lead retrofit operations. It covers the critical review of an audit, the design of a phased works programme, costing and the funding plan, tender preparation, and verification of savings once the installations are commissioned.

Learning objectives

  • Analyse an energy audit and test its underlying assumptions
  • Sequence the works to avoid technical incompatibilities
  • Cost a programme and build its funding plan
  • Draft performance requirements in tender documents
  • Verify the savings achieved after commissioning

What makes this programme different

Critical review of a real energy audit brought to the session
A phasing template for works packages that remain technically compatible
The performance clauses to insert into works contracts

Programme

1Reading and Testing the Audit

What the scenarios do not tell you

  • Quality of input data and on-site measurements
  • Calculation assumptions and sensitivity of results
  • Consistency between actual use patterns and modelled consumption
  • Interactions between envelope, plant and ventilation

2Building the Programme

Sequence before you cost

  • Sequencing of work packages and incompatibilities to avoid
  • Treatment of the envelope and thermal bridges
  • Plant replacement and ventilation upgrades
  • Costing and funding plan including available support schemes
  • Phasing works in occupied buildings

3Tenders and Verification of Savings

Committing to performance

  • Performance requirements in tender documents
  • Site supervision and technical hold points
  • Handover, commissioning and fine-tuning of installations
  • Measuring consumption after the works and analysing variances

Who is it for

Asset and estate managers · energy managers · project owners and technical managers involved in retrofit operations.

Prerequisites

Previous involvement in a retrofit project or a working knowledge of building thermal performance.

Dates & locations

36 scheduled dates between November 2026 and December 2027. Seats are confirmed in the order enquiries are received.

November 2026

December 2026

January 2027

February 2027

March 2027

April 2027

May 2027

June 2027

September 2027

October 2027

November 2027

December 2027

None of these dates suit you? We open additional sessions on request, and any programme can be run privately for your team.

Practical details

Before the programme
Online positioning questionnaire. Your development objectives are shared with the trainer, who tailors the practical case studies to your context.
Teaching methods
Theoretical input, workshops and practical case studies. Digital course materials and method sheets provided.
Assessment
Multiple-choice tests and role-play exercises. Assessment of learning at the start and end of the programme, with immediate and 60-day follow-up evaluations.
After the programme
One year of access to the e-learning platform. Self-assessment of the skills acquired and a 30-day follow-up session with your trainer.
How to register
Registration online or on the basis of a quotation.
Lead time
11 working days after confirmation of registration.
Accessibility
Accessible to people of determination. Contact our accessibility coordinator to design a suitable solution: contact@mpf-academy.ae
Start dates
Rolling intake: in addition to the scheduled sessions, this programme can start on request.