Description

Managing Health and Safety: Organising Prevention | Engaging Stakeholders | Measuring Results

Structure the health and safety function and make prevention a matter of day-to-day operational management

  • 0.75 days — 5.25 h
  • In-person or virtual
  • All levels
  • Up to 6 participants

Prevention often rests on a single person who maintains the risk register, chases overdue inspections and steps in after every incident. Line managers treat it as a specialist matter, hazard reports from the field remain rare and indicators are limited to counting accidents that have already happened.

A five-hour-fifteen virtual session to organise the function: allocating prevention responsibilities, steering risk assessment, engaging internal stakeholders and selecting indicators that anticipate. The short format concentrates on structuring the role and on the decisions to be put to senior management.

Learning objectives

  • Allocate prevention responsibilities between senior management, line managers and the safety function
  • Organise the periodic update of the risk assessment and its link to the action plan
  • Structure working relations with employee representatives and occupational health stakeholders
  • Select leading indicators rather than relying on accident statistics alone
  • Build an annual prevention plan and defend it before senior management

What makes this programme different

The allocation of responsibilities is formalised against each participant's actual organisation
Leading indicators are selected and connected to specific management actions
The annual plan presentation is prepared and then defended against budget objections

Programme

1Organising prevention

Safety as an accountability of the management line

  • Allocate roles between senior management, line managers and the safety function
  • Position employee representatives and occupational health stakeholders
  • Clarify your own mandate and the resources attached to it
  • Identify the decisions that must be escalated to senior management

2Steering risk assessment

A document used to make decisions

  • Organise the update of the assessment with the teams concerned
  • Connect the assessment to the prevention action plan
  • Take real working situations into account
  • Address risks for which no immediate solution exists
  • Track progress on the actions agreed

3Engaging and measuring

Surfacing information before the accident

  • Set up hazard reporting channels and respond to what is raised
  • Involve line managers in site walks and incident analysis
  • Select indicators that anticipate events
  • Communicate results to teams and to internal committees
  • Defend the annual prevention plan before senior management

Who is it for

Health and safety managers taking up a new role, prevention officers and site managers who carry safety accountability within their scope.

Prerequisites

Hold or be taking on a responsibility for occupational health and safety.

Dates & locations

11 scheduled dates between December 2026 and December 2027. Seats are confirmed in the order enquiries are received.

December 2026

January 2027

February 2027

March 2027

April 2027

May 2027

June 2027

September 2027

October 2027

November 2027

December 2027

None of these dates suit you? We open additional sessions on request, and any programme can be run privately for your team.

Practical details

Before the programme
Online positioning questionnaire. Your development objectives are shared with the trainer, who tailors the practical case studies to your context.
Teaching methods
Theoretical input, workshops and practical case studies. Digital course materials and method sheets provided.
Assessment
Multiple-choice tests and role-play exercises. Assessment of learning at the start and end of the programme, with immediate and 60-day follow-up evaluations.
After the programme
One year of access to the e-learning platform. Self-assessment of the skills acquired and a 30-day follow-up session with your trainer.
How to register
Registration online or on the basis of a quotation.
Lead time
11 working days after confirmation of registration.
Accessibility
Accessible to people of determination. Contact our accessibility coordinator to design a suitable solution: contact@mpf-academy.ae
Start dates
Rolling intake: in addition to the scheduled sessions, this programme can start on request.